UPSET FORGED TIE BARS FOR LIVERPOOL 2 CONTAINER PORT, UK

ASDO500 upset forged tie bars were selected for the construction of a major new container port in Liverpool. The very high loads required large diameter bars to support the tubular piled wall. Upset forged eye tie bars were selected by the contractor as the easiest installation method.


Client Peel Ports
Year 2014
ASDO-System ASDO500 M160 Upset Forged
Load Capacity 7,000kN
Tonnage Supplied 3000t
Features Upset forged eyes allowed quick and safe installation
Similar Projects Greenport Hull, Großbritannien